Kingston Grammar School
Synthetic Hockey Pitch
- Hockey Pitch Refurbishment
- The pitch lies within the Surrey landscape so the choice of contractor had to be sympathetic and creative.
- The pitch was on another site away from the main school
- Electric and Water supplied to the contractors for drinks fountain and scoreboard
- Planning was not required as it was a refurbishment of existing pitch
- Important to limit the works within the existing footprint yet incorporate contemporary designs and sizes
- FIH Tested
Before work began