Kingston Grammar School

Synthetic Hockey Pitch 

  • Hockey Pitch Refurbishment
  • The pitch lies within the Surrey landscape so the choice of contractor had to be sympathetic and creative.
  • The pitch was on another site away from the main school
  • Electric and Water supplied to the contractors for drinks fountain and scoreboard
  • Planning was not required as it was a refurbishment of existing pitch
  • Important to limit the works within the existing footprint yet incorporate contemporary designs and sizes
  • FIH Tested
  •  

Before work began 

Back to Latest Work >